Evaluasi Keterlambatan Proyek Pembangunan Jembatan Gantung Bangun Jawa I Kabupaten Serdang Bedagai
Abstract
Delays in construction projects often result in losses for construction actors, and can be caused by internal, external, and other factors such as natural, management, material, and environmental disasters. Research was conducted on the Java I Construction Suspension Bridge project, Serdang Bedagai Regency to evaluate delays in terms of cost and time. The goal is to evaluate the schedule of the project plan and implementation and find out the cause. Evaluation using the Earned Value Management method shows that project implementation tends to be slow, but costs are still below budget with an estimated Rp. 2,454,274,500,- and 36 weeks. Delays are caused by the engineering justification process, late delivery of bridge trusses, and instability of service provider cash flow. This research is expected to provide a reference for construction actors to anticipate delays in other projects.
Keywords
Full Text:
PDFReferences
Sahrial, Irwan, and Suranto, “Analisis Faktor-Faktor yang Mempengaruhi Keterlambatan Proyek Peningkatan Jalan Rel Kereta Api Medan-Binjai,” J. Ilm. Tek. Sipil dan Arsit., vol. 1, no. 1, pp. 13–24, 2022, doi: 10.31289/jitas.v1i1.1209.
A. Irwan, “Analisa Respon Mekanik Genteng Dari Bahan Beton Busa Diperkuat Serat Tkks Akibat Beban Impak Hujan Es Dengan Menggunakan Impactor Batang Aluminium,” J. Mech. Eng. Manuf. Mater. Energy, vol. 3, no. 1, p. 57, 2019, doi: 10.31289/jmemme.v3i1.2498.
E. Setiawan and D. S. Julaeha, “Employee Development at the Manpower and Transmigration Office of Sumedang Regency,” vol. 10, no. December, pp. 147–155, 2020.
B. N. Hutagalung, I. Isnaini, and M. R. Haikal, “Peran Pengawas Ketenagakerjaan Dinas Tenaga Kerja Provinsi Sumatera Utara dalam Memberikan Perlindungan Hukum atas Kasus Kecelakaan Kerja yang Mengakibatkan Pekerja Meninggal Dunia di PT. Kiat Unggul,” J. Educ. Hum. Soc. Sci., vol. 5, no. 2, pp. 1377–1387, 2022, doi: 10.34007/jehss.v5i2.1299.
A. Putri, K. A. Brahmana, A. K. Tarigan, and E. S. F. Pakpahan, “Implementasi Undang-Undang Nomor 13 Tahun 2003 dalam Perlindungan Hukum Karyawan CV. Husnajaya yang Dirumahkan Akibat Covid-19,” J. Educ. Hum. Soc. Sci., vol. 4, no. 3, pp. 1754–1764, 2022, doi: 10.34007/jehss.v4i3.948.
R. A. Rangkuti and I. Nadhirah, “Optimalisasi Peran Mediator dalam Penyelesaian Perselisihan Hubungan Industrial di Dinas Tenaga Kerja Provinsi Sumatera Utara,” J. Educ. Hum. Soc. Sci., vol. 5, no. 3, pp. 2139–2148, 2023, doi: 10.34007/jehss.v5i3.1618.
K. Hariyanti and H. Sukmana, “Strategi Dinas Ketenagakerjaan dalam Meningkatkan Kesempatan Kerja bagi Penyandang Disabilitas di Kabupaten Sidoarjo,” J. Educ. Hum. Soc. Sci., vol. 5, no. 2, pp. 949–957, 2022, doi: 10.34007/jehss.v5i2.1333.
N. F. Pangestu, A. F. A. Zahra, and S. Sutrisno, “Penerapan Metode Critical Parth Method (CPM) dalam Proyek Pembangunan Jembatan Alun-Alun Kota Kuningan,” J. Ind. Manuf. Eng., vol. 5, no. 2, pp. 100–106, 2021, doi: 10.31289/jime.v5i2.4925.
P. T. Pp and A. Kso, “Jurnal IlmiahTeknik Mesin dan Industri ( JITMI ) Analisis Evaluasi Pelaksanaan Proyek Bendungan Sibiru Biru Evaluation Analysis of the Implementation of the Sibiru Biru Dam Project using the CPM ( Critical Path Method ) Method at,” vol. 2, no. 2, pp. 84–91, 2023, doi: 10.31289/jitmi.v2i2.3418.
A. I. Permatasari, A. Profita, and S. Gunawan, “Evaluasi Metode Lean Project Management Pada Proyek Pelaksanaan Pembangunan Tangki Premium, ADO, dan RFO di Pertamina RU V Balikpapan (Studi Kasus: PT. Barata Indonesia (Persero),” JIME (Journal Ind. Manuf. Eng., vol. 6, no. 1, p. 2022, 2022, [Online]. Available: http://ojs.uma.ac.id/index.php/jime
N. P. Sari, “Jurnal Ilmiah Teknik Sipil dan Arsitektur ( JITAS ) Analisis Kehilangan Gaya Prategang Girder Pada Jembatan Proyek Analysis Of Loss Of Girder Prestress Forces On Bridge Toll Road Construction Projects High Cllips – Inderapura,” vol. 1, no. 2, pp. 112–117, 2022, doi: 10.31289/jitas.v1i2.1456.
A. Penjadwalan Proyek Pembangunan Jembatan Rel Kereta Api Bukit Putus -Padang Menggunakan Metode CPM Dan PERT, C. Okio Br Ritonga, M. Arfah, A. Lukman, and P. Studi Teknik Industri, “Scheduling Analysis of the Bukit Putus-Padang Railway Bridge Construction Project Using the CPM and PERT Methods,” JIME (Journal Ind. Manuf. Eng., vol. 7, no. 1, pp. 2549–6336, 2023.
T. D. Riyanti, W. Tambunan, and Y. Sukmono, “Analisis Human Reliability Assessment (HRA) dengan Metode HEART dan SPAR-H (Studi Kasus PT.X),” J. Ind. Manuf. Eng., vol. 5, no. 1, pp. 41–48, 2021, doi: 10.31289/jime.v5i1.4138.
P. A. Ndruru, M. Ardan, and S. Siregar, “Jurnal Ilmiah Teknik Sipil dan Arsitektur ( JITAS ) Metode Pelaksanaan Pemasangan dan Perhitungan Struktur Tower Crane Pada Proyek Pembangunan Living Plaza Medan Implementation Methods of Installing and Calculation of Tower Crane Structures in Development,” vol. 2, no. 1, pp. 44–53, 2023, doi: 10.31289/jitas.v2i1.1953.
A. Kadir, “Jurnal Administrasi Publik (Public Administration Journal),” J. Adm. Publik ( Public Adm. J. ), vol. 2, no. 1, pp. 85–107, 2014, [Online]. Available: https://www.google.com/search?safe=strict&ei=_P-mXPnMJ63az7sP1ryRwA0&q=Anggraini%2C+R.+D.+%282013%29.+Transparansi%2C+Partisipasi%2C+dan+Akuntabilitas+Pengelolaan+Anggaran+Dana+BOS+Dalam+Program+RKAS+di+SDN+Pacarkeling+VIII+Surabaya.+Kebijakan+Dan+Manajem
A. H. Sigalingging and Warjio, “Partisipasi Masyarakat Dalam Perencanaan Pembangunan (Studi Kasus Pada Kecamatan Sidikalang Kabupaten Dairi),” J. Adm. Publik ( Public Adm. J. ), vol. Volume 2, no. Desember 2014, p. 118, 2014.
S. Rangkuti, “Efetifitas Pendistribusian Pupuk Bersubsidi Di Kabupaten Deli Serdang Studi Kasus Di Kecamatan Hamparan Perak,” J. Adm. Publik ( Public Adm. J. ), vol. 3, no. 2, pp. 287–318, 2012.
S. Yuli, T. Siregar, and M. C. Ramadhan, “Analisis Hukum Terhadap Penumpang Pesawat Atas Keterlambatan Keberangkatan Penerbangan Domestik di Bandara Internasional Kualanamu Deli Serdang,” J. Educ. Hum. Soc. Sci., vol. 4, no. 2, pp. 1035–1046, 2021, doi: 10.34007/jehss.v4i2.796.
Giandini Patrisya and Nur Yulianti Hidayah, “Analisis Beban Kerja Analis Laboratorium Gas Chromatography di PT. Saraswanti Indo Genetech,” J. Ind. Manuf. Eng., vol. 6, no. 2, pp. 207–219, 2022, doi: 10.31289/jime.v6i2.8089.
D. Sugiyono, Metode Penelitian Kuantitatif, Kualitatif, dan Tindakan. 2013.
DOI: https://doi.org/10.31289/jitas.v3i1.3873
Refbacks
- There are currently no refbacks.
Copyright (c) 2024 Jurnal Ilmiah Teknik Sipil dan Arsitektur (JITAS)

